Solar and renewable energy technologies available for licensing
Renewable energy technology transfer in India: solar coatings, fuel cell and electrolyser parts, waste-to-hydrogen and battery technologies on offer, and costs.
Part of the guide Licensing technology from Indian institutions: the complete guide for companies
Renewable energy technology transfer in India covers solar coatings, solar thermal parts, fuel cell and electrolyser components, waste-to-hydrogen systems and battery materials. ARCI lists a self-cleaning coating for PV panels and a solar receiver tube at its highest readiness level, IPDI 9. IIT Roorkee transferred a waste-to-hydrogen technology in 2025 and two battery electrode technologies in 2026.
India's renewable energy industry buys most of its core equipment, such as solar cells, wafers and electrolyser stacks, from large manufacturers. The licensing opportunity for an Indian MSME or mid-sized company sits around that core: coatings that keep panels clean, solar thermal parts, fuel cell components, waste-to-hydrogen systems, battery materials and balance-of-system electronics. Indian public institutes have developed technologies in each of these, and several are on offer.
This post lists what is available, how to read readiness claims, what support exists for the licence fee, and what a first deal costs.
Which renewable energy technologies can you license?
| Area | Technology | Source | Listed status |
|---|---|---|---|
| Solar PV | Super-hydrophobic easy-to-clean coating for self-cleaning PV panels | ARCI | IPDI 9 |
| Solar thermal | Cost-efficient solar receiver tube for low and medium temperature applications | ARCI | IPDI 9 |
| Solar and optics | Dual-function anti-fogging and anti-reflective coatings | ARCI | IPDI 6 |
| Fuel cells | Electro-catalyst synthesis for fuel cells | ARCI | IPDI 9 |
| Fuel cells | Membrane electrode assembly for PEM fuel cells; DC and AC power conditioners; humidifiers | ARCI | IPDI 6 |
| Hydrogen | Membrane electrode assembly for electrolysers | ARCI | IPDI 6 |
| Hydrogen | Continuous catalytic hydrothermal gasification of organic liquid waste into hydrogen-rich gas | IIT Roorkee | Transferred to Infinate Integrated Energy Technologies LLP, reported December 2025 |
| Batteries | Two lithium-ion electrode composite technologies | IIT Roorkee | Transferred to Cathion Energy Pvt Ltd, May 2026 |
| Solar thermal | Solar powered cooking system; solar drier cum space heating system | NISE | Granted patents; no licensee named |
Sources: ARCI licensing opportunities, PIB release on IIT Roorkee's battery technology transfer, report on IIT Roorkee's waste-to-hydrogen transfer and the NISE annual report 2023-24. None of these gives licence fees or royalty rates.
ARCI's list is the most detailed public catalogue in this field. Our guide to licensing a technology from ARCI explains its process and the IPDI scale. For battery materials more broadly, see EV battery technologies to license.
How should you read the readiness claims?
ARCI's IPDI levels are its own scale, not the national TRL scale. A level 9 entry means transfer has started or the technology is ready to transfer; a lower level means more development is left for the licensee. NISE's patents are granted, which says the invention is new, not that it is ready for a factory.
| What the listing says | What it tells you | What to ask |
|---|---|---|
| IPDI 9 | Ready to transfer, often with earlier licensees | Who else holds a licence, and where |
| IPDI 6 | Further from transfer | What scale it has run at, for how long, at what cost per unit |
| Granted patent, no licensee | Protected invention | Has it been built beyond the lab? |
| Transferred to a named company | Someone is already commercialising it | Is a second, non-exclusive licence possible? |
For solar and hydrogen hardware, the cost per unit at scale decides everything. A fuel cell component that works in a lab but costs three times an imported part will not sell, however good the patent.
Licensing a renewable energy technology
What support is there for the licence fee?
The Ministry of MSME's Support for Commercialisation of IP (MSME-SCIP) programme, part of the MSME Innovative Scheme for 2023-24 to 2025-26, reimburses part of the cost of acquiring IP.
| IP acquired | Limit | Rate |
|---|---|---|
| Indian patent | ₹10 lakh | 70% of eligible cost, or the limit if lower |
| Foreign patent | ₹15 lakh | 70% of eligible cost, or the limit if lower |
| Know-how or trade secrets | ₹10 lakh | 70% of eligible cost, or the limit if lower |
Only upfront, one-time and lump-sum milestone fees payable within three years qualify; royalties do not. The MSME needs Udyam registration, a declaration of no other government funding for the same IP, and certification by an empanelled Technology Transfer Facilitation Centre. The scheme period ran to 31 March 2026, so check whether it has been extended before you rely on it.
What should you check before you license?
| Check | Why it matters in renewable energy |
|---|---|
| Unit cost at your volume | Imported parts set the price ceiling |
| Field test data | Outdoor exposure, heat and dust change performance |
| Certification path | Buyers may ask for test reports from accredited labs |
| Existing licensees | Coating licences are often split by region; check who holds which |
| Raw material supply | Catalysts and membranes may depend on imported inputs |
| Know-how support | Days of training and help with first production |
The self-cleaning coating is a good example. Its value depends on how long it lasts outdoors, under Indian dust and heat, before it needs reapplying. Ask for outdoor exposure data, not just a lab contact-angle test.
Ready-to-transfer or prototype technology
Match the readiness to the engineering team you have.
A worked example
Illustration with invented figures, except the MSME-SCIP limits. A Coimbatore MSME that cleans and maintains solar plants licenses a self-cleaning PV coating to offer as a service.
| Item | Amount (₹) |
|---|---|
| Upfront licence fee | 6,00,000 |
| Training and process transfer | 1,50,000 |
| Spray equipment and curing setup | 9,00,000 |
| Outdoor trial on 1 MW of a client's panels for six months | 3,00,000 |
| MSME-SCIP reimbursement, 70% of the ₹6,00,000 fee | minus 4,20,000 |
| Net cost before the first paid contract | 15,30,000 |
The training cost may or may not count as eligible; the example assumes it does not. If the coating saves the client two cleaning cycles a year, the MSME can price the service against the water and labour saved. The outdoor trial is the line that sells the service, because it gives the client evidence from its own panels.
What licence terms suit renewable energy technologies?
| Term | What to seek | Why |
|---|---|---|
| Field | Defined by application, such as PV module coating or industrial solar thermal | Lets the licensor license other fields to others |
| Territory | India, or named states for a service business | Matches where you can sell and support |
| Exclusivity | Non-exclusive at IPDI 9; exclusive for a period at lower readiness | Ready technologies often have several licensees |
| Royalty base | Per unit, per square metre coated or per kW | Easier to audit than net sales for service models |
| Improvements | Licence to the licensor's later improvements | Coatings and catalysts improve quickly |
| Support | Fixed days of training and help with the first production run | Know-how matters as much as the patent |
For a service business like coating application, a royalty per square metre or per MW treated is often simpler than a percentage of revenue, because the service price includes labour and travel that have nothing to do with the technology.
Common mistakes
- Treating a granted patent as proof of commercial readiness.
- Comparing a lab cost with an imported part's price without scaling it.
- Skipping outdoor or field testing in Indian conditions.
- Assuming exclusivity on a technology already licensed to others.
- Claiming MSME support for royalties, which the scheme excludes.
My view: the strongest renewable energy licences for Indian MSMEs are service-led technologies such as coatings and solar thermal parts, where the buyer is local and the product is hard to import cheaply. I am less sure about fuel cell and electrolyser components at IPDI 6: the market is growing, but unit cost against imports is the open question, so test it before you sign.
To search energy technologies across institutes, Zernyx Hub has mapped patents from universities across India, and its AI gives business insight on each technology, including its commercial applications. For a structured search, see technology scouting.
Common questions
Which public institutions license renewable energy technologies in India?
ARCI, an autonomous centre of the Department of Science and Technology, lists solar, fuel cell and electrolyser technologies for licensing. IITs license energy technologies through their technology transfer offices; IIT Roorkee's recent deals include waste-to-hydrogen and lithium-ion electrode technologies. The National Institute of Solar Energy holds granted solar patents.
What does IPDI 9 mean on ARCI's list?
ARCI uses its own IPDI scale rather than the national TRL scale. On its licensing page, level 9 means transfer has started or the technology is ready to transfer. A lower level, such as IPDI 6 for its fuel cell membrane electrode assembly, generally means more development is left for the licensee.
Can an MSME get help paying a renewable energy licence fee?
The Ministry of MSME's Support for Commercialisation of IP programme reimburses 70% of eligible upfront or one-time IP access fees, up to ₹10 lakh for an Indian patent and ₹15 lakh for a foreign one. Running royalties do not qualify, and the deal must be certified by an empanelled facilitation centre.
Are NISE's solar patents available to license?
NISE's 2023-24 annual report lists granted patents, including a solar cooking system and a solar drier cum space heating system, but names no licensees for them. Ask NISE directly whether a patent is available and on what terms.