JournalLicensing

Battery and EV technologies available for licensing from Indian institutions

Battery technology transfer in India: lithium-ion cell, electrode and fuel cell technologies from ISRO and ARCI, their terms and what to check before licensing.

By Sahil Sheikh, Regd. Patent & Trademark Agent, cRTTP 6 min read

Part of the guide Licensing technology from Indian institutions: the complete guide for companies

Short answer

Indian public institutions license battery and EV technologies to manufacturers. ISRO's VSSC offered its lithium-ion cell technology non-exclusively for a one-time fee of ₹1 crore. ARCI lists LFP and LTO electrode materials for EV batteries at its readiness level 7, and has transferred LFP cathode know-how to two companies on a non-exclusive basis within India.

Cell and battery materials manufacturing in India is still being built up, and public research bodies have offered their own battery technologies to Indian manufacturers, sometimes with a published price. For a company planning cell production, electrode materials or fuel cell components, these offers are a way to start from a process that has already run, instead of from a research paper.

This post lists the main public sources of battery and EV technology in India, the terms they have offered, the checks to make and a worked example of what a cell line licence really costs.

What battery technologies are on offer?

Source Technology Status as published
ISRO (VSSC) Lithium-ion cell production technology, for a range of power storage needs Offered to Indian industries and startups, non-exclusive
ARCI LFP and LTO electrode materials for EV batteries Readiness level 7 on ARCI's scale
ARCI LFP cathode know-how Transferred to two companies, non-exclusive within India
ARCI PEM fuel cell membrane electrode assembly Readiness level 6
ARCI Platinum-based electrocatalysts for fuel cells Readiness level 9, transfer initiated
ARCI Fe-P soft magnetic material for alternators Readiness level 5

Sources: ISRO's lithium-ion technology transfer offer, ARCI's licensing opportunities and ARCI's list of transferred technologies.

The levels on ARCI's page are its own IPDI scale, not the national TRL scale; level 9 means transfer has started. How to license a technology from ARCI explains the scale and ARCI's transfer modes. Institutes such as IITs also license battery research, usually at an earlier stage, through their technology transfer offices.

What did ISRO's lithium-ion offer look like?

ISRO's offer is the clearest published example of a battery technology licence from a public body in India. Its terms, as set out on ISRO's page:

Term ISRO lithium-ion offer
Offered by Vikram Sarabhai Space Centre (VSSC), ISRO
Who could apply Competent Indian industries and startups; consortia allowed
Exclusivity Non-exclusive
Request for qualification document ₹25,000, non-refundable
Security deposit ₹4 lakh, adjusted against the fee
Technology transfer fee ₹100 lakh (₹1 crore), one-time, within 30 days of qualifying
Hand-over Process documents after the agreement is signed and the fee paid

The offer said the technology would go to all competent firms that met the eligibility criteria. That is typical of public offers: non-exclusive, so several companies hold the same base process and compete on execution. For more on ISRO's wider programme, see ISRO technology transfer.

Licensing a public lithium-ion cell technology

1
Buy the offer documentEligibility and terms
2
QualifyMeet the criteria, pay the deposit
3
Pay the feeOne-time, within the set period
4
Sign and receive documentsProcess documents handed over
5
Build and qualify the lineYour plant, your cells

What should you check before licensing?

A battery licence buys a process. The value depends on whether that process works in your plant, with your materials, at your volumes.

Question Why it matters
Which chemistry and cell format? LFP, NMC and LTO suit different vehicles; cylindrical, prismatic and pouch cells need different lines
At what scale has it run? A lab coin cell is far from a production cell
What cycle life and safety data exist? Vehicle makers will ask for it before any order
Where will active materials come from? Lithium compounds and other inputs are often imported
What equipment is specified? Coating, calendering, winding or stacking, formation and testing lines cost far more than the licence
Is it exclusive? Non-exclusive offers mean competitors with the same base process
What support is included? Start-up help often decides how fast you reach acceptable yield

Ask for the data behind every performance figure, and for the conditions under which it was measured. Know-how licences in India covers what a process licence should hand over.

Why do electrode materials and fuel cells deserve a look?

Cell production needs a large investment. Electrode materials, fuel cell components and motor materials can be a smaller entry point. An MSME with powder processing or chemical capacity may find an electrode material licence a better fit than a cell line, because it uses skills and equipment closer to what it already has.

ARCI's transfer of LFP cathode know-how to two companies, non-exclusive within India, shows the model. A buyer of electrode material is the cell maker, so a materials licensee needs a cell maker willing to qualify its product. Start that conversation before signing.

Cell production or electrode materials

Cell production licence
Large plant investment
Sells to vehicle and storage makers
Long qualification by customers
vs
Electrode materials licence
Smaller plant, powder processing
Sells to cell makers
Needs a cell maker to qualify it

Match the licence to the plant and customers you already have.

What about safety and end-of-life rules?

Traction batteries in India face safety testing standards for vehicles, and batteries placed on the market carry producer responsibility for collection and recycling. These rules change often and differ by product and vehicle category, so this post does not summarise them. Before you license, list every standard and rule that applies to your product with your vehicle customer and a testing agency, and check that the licensor's data covers the tests they require.

A worked example

Illustration with invented figures. A Pune company plans a small lithium-ion cell line under a public non-exclusive licence like ISRO's.

Item Amount
Offer document ₹25,000
Technology transfer fee ₹1,00,00,000
Production and testing equipment ₹25,00,00,000
Building, dry room and utilities ₹8,00,00,000
Working capital for first year ₹6,00,00,000
Total ₹40,00,25,000

The licence fee is about 2.5% of the first-year outlay. The equipment, dry room and working capital decide whether the project is viable, which is why scale data and support during start-up matter more than the fee itself.

What should the licence agreement cover?

A process licence for batteries should state more than the fee. Before signing, make sure the agreement covers:

Clause What to agree
Scope Which chemistry, cell format and capacity range the licence covers
Documents The process documents, bills of material and test methods handed over
Support Days of training and start-up help, and who pays travel
Improvements Who owns improvements made by either side, and whether they are shared
Performance What happens if the process does not reach the stated performance in your plant
Field and territory Vehicles, storage or both; India only or exports too

Public offers are often on fixed terms, but support, improvements and field are worth raising before you pay.

Common mistakes

  • Choosing a chemistry before talking to the vehicle or storage customer.
  • Treating a non-exclusive public licence as a protected market.
  • Ignoring active material supply and its price swings.
  • Budgeting for the licence and underestimating the line.
  • Assuming lab cycle life will hold in production cells.

My view: for most MSMEs, electrode materials and components are a more realistic entry into the battery chain than a cell line, because the investment and the customer qualification burden are smaller. I cannot say how ISRO's licensees have fared commercially, because outcomes are not published; ask the institution for references before you commit.

To compare battery and EV technologies across many sources, Zernyx Hub has mapped patents from universities across India, with AI business insight on each, including its commercial applications.

Common questions

Which Indian institutions license battery technologies?

ISRO, through its Vikram Sarabhai Space Centre, has offered lithium-ion cell production technology to Indian industry. ARCI in Hyderabad lists LFP and LTO electrode materials, fuel cell catalysts and membrane electrode assemblies. IITs and other institutes also license battery research through their technology transfer offices.

How much did ISRO charge for its lithium-ion cell technology?

ISRO's offer set a one-time technology transfer fee of ₹100 lakh (₹1 crore) on a non-exclusive basis, a ₹25,000 non-refundable fee for the request for qualification document, and a ₹4 lakh security deposit adjusted against the fee. Process documents were handed over after the agreement was signed and the fee paid.

Can a startup license an EV battery technology from a public lab?

Yes. ISRO's lithium-ion offer was open to Indian industries and startups, including consortia. A startup must still meet the eligibility criteria in the offer document and fund the production line, which usually costs far more than the licence.

What should a company check before licensing a battery technology?

The cell chemistry and format, the scale the process has run at, cycle life and safety data, supply of active materials such as lithium compounds, the equipment needed, whether the licence is exclusive, and the support the institution will give during start-up.

Sahil Sheikh
About the author

Sahil Sheikh, Regd. Patent & Trademark Agent, cRTTP

Chief IP & Technology Officer, Zernyx Innovations

Connect on LinkedIn

Find a technology you can own.

Search patented technologies from Indian universities and labs, check their readiness and license the right one on Zernyx Hub.

Explore Zernyx Hub

Keep reading

Looking for something else?