Free tool · No sign-up · Runs in your browser
Free TRL check: what technology readiness level are you at?
Answer 12 yes-or-no questions about your technology and get an indicative technology readiness level (TRL 1 to 9), with the official NASA and EU definition of that level and what to do to reach the next one. No sign-up, and nothing you choose leaves your browser.
Answer for your technology as it is today
Answer from what you have already demonstrated, not what you plan. The check stops counting at your first No.
-
TRL 1
Have the basic scientific principles behind your technology been observed and reported?
Yes if the underlying effect is described in published papers or in your own dated lab records.
-
TRL 2
Have you written down a specific practical application of those principles and how it would work?
Yes if there is a written concept: what the technology would do, for whom, and the mechanism. It need not be tested.
-
TRL 2
Is that application supported by analysis, modelling or published work, not only by the idea itself?
Yes if calculations, simulations or references show the concept could work.
-
TRL 3
Has an experiment or analysis shown that the critical function of your concept actually works?
Yes if you have a proof of concept: the key effect demonstrated in the lab, even on separate parts.
-
TRL 4
Have the key components been put together and run as a basic system in the laboratory?
Yes if the parts work together as a rough system (a breadboard), not only one at a time.
-
TRL 4
Did the laboratory results agree with what you predicted, and are they documented?
Yes if you wrote down expected performance before testing and have a report comparing results with it.
-
TRL 5
Has the integrated system been tested in conditions that simulate real use (a relevant environment)?
Yes if tests went beyond controlled bench conditions: realistic samples, loads, temperatures, data or users.
-
TRL 6
Has a representative prototype, close to the final design, been demonstrated in a relevant environment?
Yes if a prototype with the intended form and all key functions performed in realistic simulated conditions.
-
TRL 7
Has a near-final prototype been demonstrated in the actual operating environment?
Yes for a field trial, a pilot in a plant, a hospital study or a deployment at a customer site.
-
TRL 8
Is the actual system complete and has it passed the tests and demonstrations that qualify it for use?
Yes if the final version passed acceptance or qualification tests and, where required, certification or regulatory approval.
-
TRL 9
Has the actual system been proven in routine operational use?
Yes if the final product is in real use by customers or operators, under the full range of expected conditions.
-
TRL 9
Is it in use under normal conditions, not only in a supervised trial or pilot?
Yes if it runs without the development team present, as part of normal operations.
Frequently asked questions
What is a TRL calculator?
A TRL calculator estimates a technology's readiness level, from TRL 1 (basic principles observed) to TRL 9 (actual system proven in operation), by asking what has been demonstrated and where. This free check gives an indicative level from 12 questions written from the public NASA and EU definitions.
Is this TRL check accurate?
It is indicative. It tells you which level your answers point to, but it does not look at your evidence, your technology domain or the separate critical elements of your system. For a deeper and more complete assessment, use TRL Pro, which assesses readiness with ZTRAF, Zernyx's own copyrighted framework, organised by technology domain.
How is ZTRAF different from the NASA and NTRAF scales?
NASA's definitions and NTRAF's core definitions are general: the same wording applies to a vaccine, a battery and a software product, and you interpret it for your field. ZTRAF, the Zernyx Technology Readiness Assessment Framework, is organised by technology domain, with its assessment categorised for more than 60 domains and subdomains, so your technology is assessed against criteria for its own field. It is Zernyx's own framework, aligned with global standards and separate from NTRAF. Use this free check for a first estimate and TRL Pro for a domain-specific assessment.
Which TRL definitions does this check use?
The questions follow the level definitions published by NASA (NPR 7123.1, Appendix E) and the European Union (Horizon Europe General Annexes). The result quotes both word for word. To compare them with the US DoD, India's NTRAF and BIRAC's sector scales, see the TRL levels explorer.
Can I use the result in a grant application?
Use it as a first estimate, not as evidence. Funders expect you to state the framework you used and show the evidence for each level, such as validation reports and test data. Read how to prove your TRL.
The questions are Zernyx's plain-language questions based on the public level definitions. The definitions quoted in each result are copied word for word from NPR 7123.1D, NASA Systems Engineering Processes and Requirements, Appendix E. Technology Readiness Levels and Horizon Europe Work Programme 2026-2027, 15. General Annexes, "Technology Readiness Levels". Download the TRL 1 to 9 chart (PDF).