JournalTechnology readiness

NASA TRL scale explained: definitions and success criteria by level

The NASA TRL scale from NPR 7123.1D: the definition and success criteria for each of the nine levels, what changed from older tables, and how to use it.

By Dr. Deepak Chitkara, Founder, Zernyx Innovations Updated 6 min read

Part of the guide TRL levels (1 to 9) explained: official definitions from NASA, the EU, the DoD, NTRAF and BIRAC

Short answer

The NASA TRL scale has nine levels, from TRL 1, basic principles observed and reported, to TRL 9, actual system flight proven through successful mission operations. NASA's current definitions are in Appendix E of NPR 7123.1D, effective 5 July 2023, which gives a hardware description, a software description and documented success criteria for each level.

Technology readiness levels started at NASA in the 1970s and 1980s and are now used by defence agencies, the European Union, India's NTRAF and many companies. Because the scale spread so widely, many versions circulate, and a definition copied from an old slide may not match NASA's current text. For a proposal or a paper, quote the current document.

This post sets out NASA's current definitions and success criteria for each level, explains what changed from older tables, and shows how to use the scale.

Where is the current NASA scale?

NASA's TRL definitions are in Appendix E of NPR 7123.1D, NASA Systems Engineering Processes and Requirements, effective 5 July 2023 and expiring 5 July 2028. For each level, the table gives a definition, a hardware description, a software description and success criteria. Older NASA tables called the last column "exit criteria"; the current one calls it "success criteria".

What do the nine levels say?

TRL Definition (NPR 7123.1D) Success criteria (NPR 7123.1D)
1 Basic principles observed and reported Peer reviewed documentation of research underlying the proposed concept/application
2 Technology concept and/or application formulated Documented description of the application/concept that addresses feasibility and benefit
3 Analytical and experimental proof-of-concept of critical function and/or characteristics Documented analytical/experimental results validating predictions of key parameters
4 Component and/or breadboard validation in a laboratory environment Documented test performance demonstrating agreement with analytical predictions; documented definition of potentially relevant environment
5 Component and/or brassboard validated in a relevant environment Documented test performance demonstrating agreement with analytical predictions; documented definition of scaling requirements; performance predictions made for subsequent development phases
6 System/sub-system model or prototype demonstration in a relevant environment Engineering feasibility fully demonstrated; documented test performance demonstrating agreement with analytical predictions
7 System prototype demonstration in an operational environment Documented test performance demonstrating agreement with analytical predictions
8 Actual system completed and "flight qualified" through test and demonstration All functionality successfully demonstrated in simulated operational scenarios; verification and validation completed; documented test performance verifying analytical predictions
9 Actual system flight proven through successful mission operations System has been successfully operated in the operational environment; documented mission operational results

The pattern is worth noticing. From TRL 4 to TRL 8, NASA asks for test results that agree with analytical predictions. A technology is mature when you can predict how it behaves and then show it behaves that way.

NASA TRL bands

TRL 7 to 9Operational demo, qualified, flight proven
TRL 4 to 6Lab, relevant environment, prototype
TRL 1 to 3Principles, concept, proof of concept

What does each level mean in practice?

Level Typical evidence a team holds
TRL 1 A peer-reviewed paper or report on the principle
TRL 2 A written concept with its application, feasibility and benefit
TRL 3 Lab or analytical results confirming the key parameters
TRL 4 A breadboard tested in the lab, with results matching predictions, and a written definition of the relevant environment
TRL 5 A brassboard tested in that relevant environment, plus scaling requirements
TRL 6 A high-fidelity prototype tested in a relevant environment, showing engineering feasibility
TRL 7 A system prototype tested in the operational environment
TRL 8 The final system qualified through test and demonstration
TRL 9 The system operating successfully in its mission

A breadboard is a rough lab assembly that shows the components work together. A brassboard is closer to the final form and fit, built to be tested in conditions like those it will meet. The step from breadboard to brassboard is where many university technologies stall.

What changed from older NASA tables?

Older NASA tables, still found on some NASA web pages, differ in places. For example, one older version describes TRL 1's exit criterion as a peer-reviewed publication, where NPR 7123.1D says peer-reviewed documentation. NASA's TRA Best Practices Guide of 2020 also revised wording for clarity. Do not mix columns from different versions in one table. Quote NPR 7123.1D, give its date, and say so.

Using the NASA scale in a proposal

1
Quote NPR 7123.1DAppendix E, dated
2
Define the environmentRelevant and operational
3
Match evidence to criteriaLevel by level
4
Show prediction and testAgreement at TRL 4 to 8
5
State the frameworkNASA, NTRAF or DoD

How does the NASA scale differ from DoD and NTRAF?

The three scales share nine levels and similar language, but each words some levels differently. Our post on DoD TRL definitions lists the defence version, and NTRAF and NASA TRL compared sets India's framework beside NASA's. The safest rule is to use the framework your funder or partner names, and say which one you used.

Partner or purpose Framework to quote
NASA or a space partner NPR 7123.1D
US defence partner DoD TRA Guidebook
Indian funder The framework the call names, often NTRAF
Journal paper Any, stated explicitly
Your own check, before you quote any of these ZTRAF in TRL Pro, with questions specific to your technology domain

Why does the relevant environment matter so much?

From TRL 4, NASA asks for a documented definition of the relevant environment. This is the set of conditions that matter for the technology, such as temperature, vacuum, vibration or radiation for a space component. Writing it down early forces the team to think about what success will mean outside the lab. Without it, a claim of TRL 5 or 6 cannot be checked. Our post on keeping TRL evidence explains how to record each test so the level can be shown later.

How does ZTRAF check TRL?

ZTRAF, the Zernyx Technology Readiness Assessment Framework, is Zernyx's own copyrighted framework, aligned with global standards and separate from NTRAF, used in TRL Pro. TRL Pro asks structured questions for each level, records the evidence behind each answer, and returns the assessed level with the gaps to close and the next steps, with a Zernyx TRL certificate (Zernyx's own, not a government one).

Because the questions follow your own sub-domain, you get a fuller picture than a general scale gives, in a few plain steps.

A worked example

Illustration with invented facts. An Indian institute is developing a thermal coating for small satellites with a foreign space partner.

Evidence NASA level
Published paper on the coating chemistry TRL 1
Concept note on use in satellite radiators TRL 2
Lab samples confirming emissivity predictions TRL 3
Coated breadboard panel tested in the lab, matching predictions; relevant environment written down TRL 4
Brassboard panel tested in a thermal vacuum chamber, scaling requirements set TRL 5

The team reports TRL 5 to its partner under NPR 7123.1D. Its own documents show the prediction and test result for each step, which is what the success criteria ask for.

Common mistakes

  • Quoting an old NASA table without saying so.
  • Mixing NASA, DoD and NTRAF wording in one table.
  • Claiming TRL 5 without a written definition of the relevant environment.
  • Test results with no prior analytical prediction.
  • Rating a whole system with one number when parts differ.

My view: NASA's success criteria are the most useful part of the scale, because they turn a vague level into evidence a reviewer can check. The hedge is that NASA revises its procedures from time to time, so check the current NPR before quoting it in a proposal.

To find space and aerospace technologies from Indian institutions at different readiness levels, Zernyx Hub has mapped patents from universities across India, and its AI gives business insight on each technology, including its commercial applications.

Common questions

Where are the official NASA TRL definitions?

In Appendix E of NASA Procedural Requirements NPR 7123.1D, NASA Systems Engineering Processes and Requirements, effective 5 July 2023. It gives a definition, hardware and software descriptions and success criteria for each of the nine levels.

What are TRL exit criteria or success criteria?

They are the evidence NASA expects before a technology is rated at a level, such as peer-reviewed documentation at TRL 1 or documented test performance agreeing with analytical predictions at TRL 4 to 7. Older NASA tables called them exit criteria; NPR 7123.1D calls them success criteria.

Is TRL 6 in a relevant or an operational environment?

In NPR 7123.1D, TRL 6 is a system or sub-system model or prototype demonstration in a relevant environment. Some older NASA tables still online describe TRL 6 differently, so quote the current document and say which version you used.

Should Indian researchers use the NASA scale?

Use it when a partner or journal asks for NASA levels. Indian funders usually name their own framework, often NTRAF. The evidence is the same; state which framework you used whenever you give a level.

Dr. Deepak Chitkara
About the author

Dr. Deepak Chitkara

Founder, Zernyx Innovations

Connect on LinkedInWatch on YouTube
More about Dr. Deepak Chitkara
  • Professor, Department of Pharmacy, BITS Pilani.
  • Has coordinated the Intellectual Property Enablement and Commercialization (IPEC) division at BITS Pilani.
  • Has served as Coordinator of the BITS-Technology Enabling Center, supported by the Department of Science and Technology (DST), Government of India.

Know your TRL before a reviewer asks.

Run a guided, evidence-backed TRL 1 to 9 assessment with TRL Pro, ready for funding, licensing and commercialization decisions.

See how TRL Pro works

Keep reading

Looking for something else?