FDA stages and TRL: mapping medical product readiness for US submissions
FDA TRL mapping for drugs and devices. FDA does not assign TRLs; US medical funders tie TRL 5 to an IND or IDE, TRL 6 to Phase 1 and TRL 8 to approval.
Part of the guide TRL levels (1 to 9) explained: official definitions from NASA, the EU, the DoD, NTRAF and BIRAC
FDA does not assign technology readiness levels. It reviews products through its own pathways, such as the IND, IDE, 510(k), De Novo and PMA. US defence medical funders map TRLs onto those steps: TRL 5 ends with an IND or IDE, TRL 6 is Phase 1, TRL 8 is FDA approval or clearance and TRL 9 is postmarketing.
A biotech or medtech team that pitches to a US partner meets two vocabularies at once. The funder or the investor asks for a technology readiness level. The regulator asks a different question entirely: has an IND been filed, is the IDE in place, which pathway will the device take? The two only meet if you build the bridge yourself.
This guide is for Indian researchers and startups developing a drug, biologic or medical device with an eye on the US market. It explains what the FDA actually reviews, how US medical funders tie TRLs to FDA steps, and what evidence you need at each level before you call it.
Does the FDA use TRLs?
No. FDA does not grade products on a nine-level scale. It works through its own pathways. A new drug enters people under an Investigational New Drug application (IND) and reaches the market through a New Drug Application (NDA) or, for a biologic, a Biologics License Application (BLA). A device is placed in Class I, II or III by risk, may need an Investigational Device Exemption (IDE) for clinical studies, and reaches the market through a 510(k), a De Novo request or a Premarket Approval (PMA).
The TRL language comes from elsewhere. US defence medical research programmes adapted the general TRL scale to medical products. The Congressionally Directed Medical Research Programs (CDMRP) say in their Biomedical Product Maturity Guidelines (June 2026) that the TRL framework was adapted and tailored "to align with standard scientific milestones and FDA regulatory phases". Their funding calls use it too: a FY2026 Translational Research Award from the Combat Readiness Medical Research Program asks for a minimum biomedical TRL of 4, and points to the biomedical TRLs in Appendix E of the 2009 DoD Technology Readiness Assessment Deskbook.
So when a US partner asks for your TRL, give the level and the FDA step that supports it. The step is what a regulatory reviewer will check.
How do TRLs map to FDA stages?
The table uses the CDMRP guidelines, which give one scale for drugs, biologics and devices. TRL 1 to 3 cover basic research, the idea and early proof of concept, before any FDA contact. The last column gives the matching level definition in ZTRAF, Zernyx's own framework.
| TRL | CDMRP wording (June 2026), shortened | FDA step for a drug or biologic | FDA step for a device | ZTRAF (Zernyx, used in TRL Pro) |
|---|---|---|---|---|
| 4 | Initial absorption, distribution, metabolism and excretion studies complete | Lead candidate in non-clinical work | Prototype tested in the lab | The technology is tested in controlled experiments or lab tests, and its key performance measures are evaluated. |
| 5 | GLP studies done to support regulatory review, such as an IDE or IND, and approval secured to begin preliminary human studies | IND in effect | IDE approved, or IRB approval for a non-significant risk study | Performance is shown in controlled, pre-pilot studies, and the limitations and risks are identified. |
| 6 | Phase 1 clinical trials or early device safety testing | Phase 1 | Early feasibility or first-in-human study | An integrated prototype or pilot system is demonstrated. |
| 7 | Phase 2 or Phase 3 trials; device prototypes evaluated in operational or simulated settings | Phase 2 and Phase 3 | Larger clinical study | The technology is validated at pilot scale in near-real field, clinical or user conditions, and the data supports scale-up. |
| 8 | Formal regulatory approval or clearance, such as PMA or 510(k) | NDA or BLA approved | 510(k) cleared, De Novo granted or PMA approved | Final validation against acceptance criteria is complete, and the approvals or certifications it needs are granted or under review. |
| 9 | Product fielded or marketed, with required postmarketing surveillance | Phase 4 and postmarketing safety monitoring | Postmarket surveillance | The technology is approved where required and in real-world use, with monitoring and maintenance in place. |
One detail surprises people. In the CDMRP wording, Phase 3 sits at TRL 7. TRL 8 means the approval itself. Some older tables and some grant forms put Phase 3 at TRL 8, so check which definitions your funder uses before you write a number.
The CDMRP and DoD scales use one wording for drugs, biologics and devices. ZTRAF goes a step deeper: it covers 10 domains and more than 60 sub-domains, and a new chemical entity, a biosimilar, a vaccine and a Class C or D device each get their own questions and evidence.
TRL 4 to 9 against FDA steps, CDMRP wording
What happens at the IND and IDE step?
For most teams the jump from TRL 5 to TRL 6 is the moment the FDA becomes real.
Drugs and biologics. Under 21 CFR 312.40, an IND goes into effect 30 days after FDA receives it, unless FDA places the study on clinical hold, or earlier if FDA says the study may begin. 21 CFR 312.21 describes the phases:
| Phase | What it studies | Typical size in the regulation | TRL (CDMRP) |
|---|---|---|---|
| Phase 1 | First use in humans: metabolism, pharmacology, side effects at rising doses | Generally 20 to 80 subjects | 6 |
| Phase 2 | Controlled studies of effectiveness and short-term risks | No more than several hundred subjects | 7 |
| Phase 3 | Expanded trials of effectiveness and safety | Several hundred to several thousand subjects | 7 |
Devices. A significant risk device study needs both an approved IDE and approval from an institutional review board (IRB). A non-significant risk study needs only IRB approval and abbreviated IDE requirements. An IDE application is considered approved 30 days after FDA receives it, unless FDA tells the sponsor otherwise earlier.
Before either step, a device team can ask FDA for written feedback through the Q-Submission Program. The current guidance was issued on 29 May 2025. FDA aims to give written feedback on a Pre-Submission within 70 days, and meetings are usually held 70 to 75 days after the request arrives. A Pre-Sub at TRL 4 or 5 often saves a wasted study at TRL 6.
Which device pathway, and what does it cost?
Device class decides the route to market, and the route decides what TRL 8 will take.
Two common device routes to TRL 8
No predicate for a low or moderate risk device? Ask about De Novo.
A 510(k) shows that a device is substantially equivalent to one already on the market, and FDA usually decides within 90 days. A De Novo request classifies a novel device that has no predicate into Class I or II. A PMA evaluates the safety and effectiveness of a Class III device under 21 CFR Part 814.
Each route has an FDA user fee. These are the FY2027 fees, which apply from 1 October 2026 to 30 September 2027:
| Submission | Standard fee | Small business fee |
|---|---|---|
| 510(k) | $28,653 | $7,163 |
| De Novo request | $191,020 | $47,755 |
| PMA | $636,732 | $159,183 |
| Annual establishment registration | $13,785 | No small business rate; FDA may waive it for a qualifying small business that shows financial hardship |
An Indian company can qualify for the small business fee. Under FDA's Small Business Determination program, gross receipts of $100 million or less, including affiliates, qualify. A foreign applicant needs a certification from its national taxing authority, on Form 3602N, for itself and each foreign affiliate. Apply before you submit: a submission sent before small business status is granted pays the full fee, with no refund.
Here is an illustration, with invented assumptions. An Indian startup plans a 510(k) for a Class II monitoring device in FY2027 and qualifies as a small business. Its FDA fee is $7,163 instead of $28,653, a saving of $21,490. At an assumed rate of ₹85 to the dollar, that is about ₹6.1 lakh instead of about ₹24.4 lakh, a difference of about ₹18.3 lakh. The certification takes time to obtain, so in practice it belongs on the plan at TRL 6 or 7, well before the submission.
Can Indian clinical data support a US submission?
For devices, yes, on conditions. 21 CFR 812.28 says FDA accepts data from clinical investigations outside the United States if the study is well designed and well conducted, the sponsor states that it followed good clinical practice, including review by an independent ethics committee and freely given informed consent, and FDA can validate the data, for example through an onsite inspection. The supporting information required is fuller for a significant risk study.
For drugs, foreign data can also support an application, but the rules differ by product and study design. Ask a US regulatory adviser early, before the Indian trial protocol is fixed, because a protocol written only for CDSCO may miss what FDA expects.
A foreign device establishment must also register with FDA and name a United States agent who lives or keeps a place of business in the United States.
Common mistakes
- Calling a device TRL 6 because the prototype works on the bench. Without first-in-human or early safety testing under an IDE or IRB approval, US medical funders will usually read it as TRL 4 or 5.
- Writing TRL 8 for a drug in Phase 3. In the CDMRP wording that is TRL 7; TRL 8 is the approval.
- Assuming one TRL table fits every funder. The 2009 DoD Deskbook, the CDMRP guidelines and older grant forms differ in detail.
- Planning the GLP package without asking FDA. A Pre-Sub or a pre-IND meeting is cheaper than repeating a study.
- Leaving the small business application to the week of submission.
How should you state your level?
In practice, a US partner trusts a TRL claim most when it comes with the FDA step attached, such as "TRL 6: Phase 1 under IND, first cohort dosed". The number alone invites doubt. One honest caveat: these mappings are funder conventions. FDA rules do not use them, and a partner may use slightly different definitions, so quote the definitions you used.
For the Indian side of the same journey, read our guides to TRL for medical devices and TRL for drug development. The general scale is in TRL levels explained, the DoD wording in DoD TRL definitions, and the evidence to keep in how to prove your TRL.
For a quick indicative level, try the free TRL calculator. For a full assessment, TRL Pro asks structured questions for each level, records the evidence behind each answer, and returns the assessed level with the gaps to close and the next steps. The result comes with a Zernyx TRL certificate, which is Zernyx's own certification, not a government one.
Common questions
Does the FDA use technology readiness levels?
No FDA review pathway uses TRLs. FDA decides on an IND, IDE, 510(k), De Novo, PMA, NDA or BLA by its own rules. TRLs come from funders and partners, such as US defence medical research programmes, which map their levels onto FDA steps.
What TRL is a drug in Phase 1 clinical trials?
TRL 6 in the Biomedical Product Maturity Guidelines published by the US Congressionally Directed Medical Research Programs in June 2026. The same guidelines place Phase 2 and Phase 3 at TRL 7 and FDA approval at TRL 8.
What TRL does a 510(k) clearance correspond to?
TRL 8. The CDMRP guidelines describe TRL 8 as obtaining formal regulatory approval or clearance, giving FDA Premarket Approval or 510(k) clearance as examples.
Can data from Indian clinical studies support an FDA device submission?
It can. Under 21 CFR 812.28, FDA accepts data from device studies outside the United States if the study is well designed and well conducted, follows good clinical practice including independent ethics review and informed consent, and FDA can validate the data, for example by inspection.