Short answer

To show TRL in a pitch deck, state one level using a named scale such as NTRAF, back it with the evidence that level requires, and show the milestones and money needed to reach the next level. NTRAF asks for a Component/System Validation Report at TRL 4 and an Engineering/Pilot-Scale Prototype Demonstration Report at TRL 6, so name that evidence.

A deep-tech pitch deck has to answer a question a software deck rarely faces: does the thing actually work yet, and how far is it from a product? Technology readiness level is the shorthand most investors and their technical advisers now understand. Used well, one slide with a TRL on it can tell an investor in thirty seconds where the risk is and what their money will buy. Used badly, it becomes the first claim their adviser takes apart.

This guide shows how to state TRL in a deck for Indian investors, what evidence to put behind it, how to tie the raise to the next level, and the claims that fail diligence.

Why do investors care about TRL?

An investor in a deep-tech company is buying a share of future sales, but most of the risk sits before any sale: will the technology work at scale, in real conditions, at a cost buyers accept? TRL gives that risk a common vocabulary.

What the investor wants to know What TRL tells them
How much technical risk is left Lower levels carry more
What the next round of money buys The move from one level to the next
How long to first revenue Higher levels are usually closer to sale
Whether the founders understand their own gaps An honest level with named gaps

The last row is underrated. A founder who says "we are at TRL 4; here is what TRL 5 needs and what it will cost" shows judgement. A founder who says TRL 7 and cannot name the operational test shows the opposite.

Which scale should you use?

Name a scale on the slide. India's National Technology Readiness Assessment Framework (NTRAF), from the Office of the Principal Scientific Adviser, is the national reference. Its definitions and the supporting document it asks for at four key levels:

TRL NTRAF definition Supporting document NTRAF names
4 Component and/or system validation in lab Component/System Validation Report
5 Laboratory scale, similar system validation in relevant environment Laboratory-Scale Prototype Validation Report
6 Engineering/pilot-scale prototype demonstrated in relevant environment Engineering/Pilot-Scale Prototype Demonstration Report
7 Full scale system prototype demonstration in operational environment Full-Scale System Prototype Demonstration Report

For biotech, drugs, devices and diagnostics, BIRAC's sector documents are also widely used. Pick one and stick to it across the deck and the data room. NTRAF explained covers the framework in full.

What should the TRL slide show?

One slide, four parts.

Part What to write Example
Current level One number, with the scale named TRL 5 (NTRAF)
Evidence The test that proves it Lab-scale prototype run for 500 hours at customer-like conditions
Next level What it requires Pilot-scale unit at a partner site for six months
Use of funds Money and time to get there ₹1.8 crore and 12 months

Put the full test report in the data room and say so on the slide. Investors' technical advisers will ask for it, and having it ready shortens diligence. Our post on evidence for a TRL claim covers what each level's evidence should contain.

Building the TRL slide

1
Name the scaleNTRAF or a BIRAC sector document
2
State one levelFor the technology as it stands
3
Show the evidenceThe test that proves it
4
Name the next levelWhat it requires
5
Tie it to the raiseMoney and months

How do you tie the raise to the next TRL?

The strongest decks connect the round to a readiness step. The money buys a specific move up the scale, and the next round is raised on the evidence that move produces.

Round A readiness step it often funds
Grant or pre-seed TRL 3 to 4: proof of concept to lab validation
Seed TRL 4 to 6: lab validation to pilot-scale prototype
Series A TRL 6 to 8: pilot to qualified product and first customers

This is a pattern, not a rule. A software-heavy product may move faster, and a regulated medical product will take longer at every step. Our post on moving from TRL 4 to TRL 6 covers the seed-stage climb in detail, and TRL for the Startup India Seed Fund covers one government source of early money.

Two ways to present the same startup

Overclaimed
TRL 7 stated, no named test
Range of levels on different slides
Use of funds not tied to milestones
vs
Credible
TRL 5 stated with the test report
One scale throughout
Raise buys the move to TRL 6

A modest, proven level funds more easily than a big, unproven one.

What claims fail diligence?

Claim Why it fails Better wording
"TRL 7" for a lab prototype TRL 7 needs a full-scale prototype in an operational environment "TRL 5; pilot planned"
One TRL for a multi-part system The weakest part sets the risk Levels by subsystem
"Validated" with no environment named Lab, relevant and operational environments are different levels Name where it was tested
TRL from a different scale on each slide Advisers cannot check it One named scale
Customer letters of intent as TRL evidence Interest is not test data Keep LOIs on the market slide

An overclaim found in diligence damages more than the TRL slide. It makes the adviser doubt every other number in the deck, as our post on startup IP due diligence explains for ownership claims too.

How does ZTRAF check readiness before you pitch?

ZTRAF, the Zernyx Technology Readiness Assessment Framework, is Zernyx's own copyrighted framework, aligned with global standards and used in TRL Pro. It covers more than 60 technology domains and subdomains. TRL Pro asks structured questions for each level, records the evidence behind each answer, and returns the assessed level with the gaps to close and the next steps, with a Zernyx TRL certificate (Zernyx's own, not a government one). The gaps list is useful raw material for the "next level" line on your slide. If an investor asks for NTRAF or BIRAC wording, state the level in that wording too.

That way the level comes with the gaps to close and a confidence level, judged against what your field normally shows.

A worked example

Illustration with invented figures. A Chennai startup has a membrane for removing fluoride from groundwater. Its first deck said "TRL 7, ready to scale".

Item First deck Revised deck
Level claimed TRL 7 TRL 5 (NTRAF)
Evidence shown Photos of a unit Lab-scale prototype validation report: 400 litres a day on borewell water from two districts for 90 days
Next level Not stated TRL 6: pilot unit of 5,000 litres a day at a village water plant for six months
Raise ₹3 crore, "for scale-up" ₹2 crore: ₹1.2 crore pilot, ₹0.5 crore team, ₹0.3 crore certification and IP
Investor response Adviser asked for operational data that did not exist Term sheet conditional on the pilot site agreement

The revised deck asked for less money and got further, because every number on the TRL slide could be checked.

Common mistakes

  • Claiming a level without naming the test that proves it.
  • Mixing scales across slides.
  • Giving one level for a system whose parts differ.
  • Raising money with no readiness step attached.
  • Treating customer interest as technical evidence.

My view: the TRL slide is where a deep-tech founder earns the investor's trust for the rest of the deck, so understate slightly and prove everything you claim. The hedge is that investors differ, and some angel investors care far less about TRL than about the team and market; an institutional investor with a technical adviser will check it closely, so prepare for that reader.

Before you put a number on the slide, TRL Pro assesses your technology's readiness and returns a level from TRL 1 to 9 with the gaps to close. For how grant reviewers treat overclaims, see TRL overstatement in grants.

Common questions

Should a pitch deck state a single TRL or a range?

A single level for the technology as it stands, with the evidence behind it. If different parts are at different levels, say so plainly, for example the sensor at TRL 6 and the software at TRL 4. A range like TRL 4 to 6 reads as uncertainty.

Which TRL scale should Indian founders use?

Name the scale you use. India's National Technology Readiness Assessment Framework (NTRAF) was proposed by the Office of the Principal Scientific Adviser as a national framework, and BIRAC has sector documents for drugs, devices and diagnostics. Using a named scale lets an investor's adviser check your claim.

What evidence should go on the TRL slide?

The test that proves the level: what was tested, at what scale, in what environment and with what result. NTRAF names a supporting document for each level, such as a Laboratory-Scale Prototype Validation Report at TRL 5.

Do investors penalise a low TRL?

Not by itself. Investors price risk, and a clear TRL 4 with a credible plan to TRL 6 is easier to fund than a vague TRL 7. An overclaim found in diligence costs more trust than a modest level stated honestly.

Dr. Deepak Chitkara
About the author

Dr. Deepak Chitkara

Founder, Zernyx Innovations

Connect on LinkedInWatch on YouTube
More about Dr. Deepak Chitkara
  • Professor, Department of Pharmacy, BITS Pilani.
  • Has coordinated the Intellectual Property Enablement and Commercialization (IPEC) division at BITS Pilani.
  • Has served as Coordinator of the BITS-Technology Enabling Center, supported by the Department of Science and Technology (DST), Government of India.