GuideLicensing

Technology scouting for MSMEs: a 30-day plan to find a technology to license

Technology scouting for MSMEs in India: a 30-day plan to write the spec, search patents and lab lists, score a shortlist and pick a technology to license.

By Dr. Deepak Chitkara, Founder, Zernyx Innovations 9 min read

Part of the guide Licensing technology from Indian institutions: the complete guide for companies

Short answer

Technology scouting for MSMEs fits into 30 days. Week 1 turns the problem into a one-page specification. Week 2 searches IP India, Espacenet, Google Patents and institutional technology lists. Week 3 scores candidates on six weighted criteria. Week 4 holds talks with the top two or three owners and ends in a go, park or drop decision.

Most MSMEs have no research department, and few owners have a spare month. Yet many shop-floor problems, from the colour in a dye-house effluent to the life of a coating or the energy a dryer burns, have already been studied in an Indian institute or government laboratory, and some of that work is waiting for a licensee. What the MSME needs is a way to find it, judge it and decide within the time a busy owner can actually give.

This guide sets out that way as a 30-day plan. Our broader guide to technology scouting treats scouting as a standing habit for an R&D team. The aim here is narrower and, for a smaller firm, more practical: one problem, one month, one decision.

The short answer

Give the search a fixed 30 days and a single owner. In week 1, write the problem as a one-page specification with must-haves and knock-out rules. In week 2, search IP India's public search, Espacenet, Google Patents, institutional technology transfer pages and government technology lists, and build a long list. In week 3, score each candidate against weighted criteria and keep the top two or three. In week 4, talk to the owners, under an NDA where you need confidential data, and decide: go, park or drop.

Thirty days from problem to decision

Day 1Name one ownerOne person, one problem
Day 7Specification agreedMust-haves and knock-outs
Day 14Long list readyPatents, TTO pages, lab lists
Day 21Shortlist of two or threeScored on six weighted criteria
Day 30Go, park or dropA one-page decision memo

Why give it exactly 30 days?

Because a deadline imposes the discipline that technology transfer offices reward. An office handles many enquiries, and the ones that move are specific: a named technology, a clear use and a company that knows what it needs. Without a date, scouting drifts into reading interesting patents.

There is also a policy reason the effort is worth making. Publicly funded institutions are expected to see their results used. ICMR's 2021 technology transfer guidelines, for instance, make non-exclusive transfer the default and say expressions of interest will, case by case, also be invited through ICMR's website. For an MSME, a non-exclusive licence is often all it needs. How quickly an office replies varies by institute, so leave some slack in week 4.

One example runs through this guide: a textile dyeing unit that must remove colour from its effluent and wants a cheaper process than the one it runs today.

Week 1 (days 1 to 7): what exactly is the problem?

The commonest failure is to start searching before the problem is written down. Describe what the technology must do, in functional terms, and what you cannot change. Separate must-haves from nice-to-haves, and name the knock-outs that end a candidate's chances whatever its other merits.

Requirement Must have Nice to have
Function Removes colour from 200 m³ of effluent a day to our consent limit Also lowers COD
Footprint Fits existing tanks and power supply Skid-mounted
Running cost Below our current cost per m³ At least 20% lower
Readiness Shown at pilot scale on real dye-house effluent Running at one plant
Deal Non-exclusive licence for our own plant Option for a second plant
Knock-out Creates a new hazardous sludge stream

The table is illustrative; the shape is what to copy. Share it with the person who will run the process on the floor, who often knows a constraint the owner has forgotten.

A word on exclusivity. An MSME that will use a process only in its own plant should rarely ask for it. Exclusivity costs more, takes longer to negotiate and protects a market position the firm is not trying to build. Spend that negotiating effort on know-how transfer and inventor support instead.

Use free public sources. Search by function, never by your product's trade name, and note the classification codes on the first few relevant patents so you can search by code as well. Our technology scouting guide explains that method.

Start with the patent databases:

Every database has a blind spot. Under Rule 24 of the Patents Rules, an application normally stays closed to the public for 18 months from its filing or priority date, whichever is earlier. An institute's newest inventions may not appear in any database, which is why its own lists matter.

Then go to the institutions:

Finally, the government laboratories. BARC publishes technologies available for transfer in eight categories, including water technology, environment and chemical, which makes it the first stop for our dyeing unit. DRDO's transfer of technology page lists Category B dual-use technologies, transferred for manufacture and sale in commercial markets, many with bidding start and close dates. ICMR invites expressions of interest one technology at a time; one 2026 call, for a CRISPR-based melioidosis test, was published on 4 August and closed on 25 August, a 21-day window. Our guides to BARC, DRDO and ICMR explain each process.

Zernyx Hub fits this step and the next. It has mapped patents from universities across India, and its AI gives business insight on each one, including its commercial applications. By day 14, aim for a long list of 10 to 25 candidates, each with its owner, its patent or application number and its stated stage.

Week 3 (days 15 to 21): how do you shortlist?

Score every candidate from 1 to 5 on six criteria, multiply by the weights and add. Set the weights before you score, so that a favourite cannot bend them. Here are three invented candidates for the dyeing unit: A, a published patent application from an IIT with lab results only; B, a government laboratory process listed for transfer, with pilot-scale data; C, a granted university patent filed in 2014, with one field trial.

Criterion Weight What earns a 5 A B C
Technical fit with the spec 30% Meets every must-have 4 4 3
Evidence of readiness 20% Pilot or plant data on similar effluent 2 4 3
IP position 15% Alive in India, clear owner, long life left 4 3 2
Fit with plant and people 15% Runs on existing equipment and skills 3 4 4
Owner and terms 10% Office responds, non-exclusive offered 4 3 3
Cost to first use 10% Low licence and adaptation cost 3 3 4
Weighted score (out of 5) 3.35 3.65 3.10

For B: 4 × 0.30 + 4 × 0.20 + 3 × 0.15 + 4 × 0.15 + 3 × 0.10 + 3 × 0.10 = 3.65. Two rules sit above the arithmetic. A score of 1 on technical fit, or any knock-out, drops a candidate whatever its total. And keep only the top two or three, here B and A.

C shows why the IP column matters. Under Section 53 of the Patents Act, a patent lasts 20 years from filing, so a 2014 filing expires in 2034, and an unpaid renewal fee ends it sooner. This week, check only status, applicant and renewals on IP India. The full check comes after the decision, and our patent due diligence checklist covers it.

Week 4 (days 22 to 30): first conversations, then the decision

Write to the technology transfer office as well as the professor, because the institution usually owns the IP and signs the licence. Name the technology or application number, state your problem in two sentences and ask whether it is available, what stage it has reached, its patent status and whether the inventor is open to a call. IIT Delhi's FITT, for example, publishes an eight-step process in which only non-confidential information is shared at the query stage, an NDA may be signed when a company wants more technical detail, and the company later submits a letter of intent with a licence application.

What you receive first will be non-confidential, often a short summary. Our guide on how faculty write a non-confidential summary shows what it will and will not contain. Under the NDA, ask for the raw pilot data and the failure cases, the process conditions and know-how, any earlier licences in your field, and how much inventor support comes with the transfer.

What to ask before the NDA, and what to ask under it

Before any NDA
Is it available for licensing?
What stage has it reached?
Patent status and number
Is the inventor open to a call?
vs
Under the NDA
Raw pilot data and failure cases
Process conditions and know-how
Earlier licences in your field
Inventor support during transfer

Sign the NDA when you need unpublished data.

By day 30, write a one-page decision memo: the problem, the specification, the scores, the choice and the open questions. It ends in one of three outcomes. Go means you ask for a term sheet and start due diligence; our guide to licensing from a university or lab covers what follows. Park means the best candidate is promising but not ready, so you set a date to look again. Drop means rewriting the specification or reconsidering the route; build, buy or license helps with that choice, and MSME technology adoption schemes shows which government schemes may share the cost.

When you do sign, remember the formalities. Under Section 68, a patent licence is valid only in writing, in a document setting out all its terms. Under Section 69, the licensee applies to the Controller to register it, on Form 16 under Rule 90.

Common mistakes

  • Searching before the specification exists.
  • Treating a journal paper as a plant-ready process.
  • Asking for exclusivity on a process used only in your own plant.
  • Missing an ICMR or DRDO window because nobody checked that week.
  • Leaving the IP status check until after the term sheet.

Common questions

Can a small MSME license a technology from an IIT or a government lab?

Yes. IIT Delhi's FITT publishes a licensing process open to companies, and BARC and DRDO list technologies available for transfer. Read each call's eligibility rules first: one 2026 ICMR expression of interest asked for a manufacturing unit in India and, for commercial firms, no overall loss in the past three years, with relaxations for MSMEs and startups.

Do I need an NDA before contacting a technology transfer office?

Not for the first contact. FITT at IIT Delhi, for example, shares only non-confidential information at the query stage, and an NDA may be signed when a company asks for more technical detail.

Why can't I find a university's newest inventions in patent databases?

Under Rule 24 of the Patents Rules, an Indian application is normally kept from the public for 18 months from its filing or priority date, whichever is earlier. Institution lists of recently filed IP can show such inventions sooner.

What if no candidate scores well after 30 days?

Park the search and revisit the specification. If the problem is real and nothing suitable exists, sponsored research with an institute or in-house development may fit better than a licence.

Dr. Deepak Chitkara
About the author

Dr. Deepak Chitkara

Founder, Zernyx Innovations

Connect on LinkedInWatch on YouTube
More about Dr. Deepak Chitkara
  • Professor, Department of Pharmacy, BITS Pilani.
  • Has coordinated the Intellectual Property Enablement and Commercialization (IPEC) division at BITS Pilani.
  • Has served as Coordinator of the BITS-Technology Enabling Center, supported by the Department of Science and Technology (DST), Government of India.

Find a technology you can own.

Search patented technologies from Indian universities and labs, check their readiness and license the right one on Zernyx Hub.

Explore Zernyx Hub

Keep reading

Looking for something else?