# Free TRL calculator: check your technology readiness level in 2 minutes

Source: https://zernyxhub.com/tools/trl-calculator
Updated: 2026-11-21
Publisher: Zernyx Hub (Zernyx Innovations Pvt. Ltd.)

> Answer 12 yes-or-no questions about your technology and get an indicative technology readiness level (TRL 1 to 9), with the official NASA and EU definition of that level and what to do to reach the next one. No sign-up, and nothing you choose leaves your browser.

## How the check works

Answer each question Yes or No. Your indicative TRL is the highest level for which every question up to and including that level is answered Yes. The check stops counting at the first No. It is indicative only, not a certification, and does not use ZTRAF. For an assessed level with an evidence record, use TRL Pro: https://app.zernyxhub.com/trl-calculator

## Questions

1. (TRL 1) Have the basic scientific principles behind your technology been observed and reported? Yes if the underlying effect is described in published papers or in your own dated lab records.
2. (TRL 2) Have you written down a specific practical application of those principles and how it would work? Yes if there is a written concept: what the technology would do, for whom, and the mechanism. It need not be tested.
3. (TRL 2) Is that application supported by analysis, modelling or published work, not only by the idea itself? Yes if calculations, simulations or references show the concept could work.
4. (TRL 3) Has an experiment or analysis shown that the critical function of your concept actually works? Yes if you have a proof of concept: the key effect demonstrated in the lab, even on separate parts.
5. (TRL 4) Have the key components been put together and run as a basic system in the laboratory? Yes if the parts work together as a rough system (a breadboard), not only one at a time.
6. (TRL 4) Did the laboratory results agree with what you predicted, and are they documented? Yes if you wrote down expected performance before testing and have a report comparing results with it.
7. (TRL 5) Has the integrated system been tested in conditions that simulate real use (a relevant environment)? Yes if tests went beyond controlled bench conditions: realistic samples, loads, temperatures, data or users.
8. (TRL 6) Has a representative prototype, close to the final design, been demonstrated in a relevant environment? Yes if a prototype with the intended form and all key functions performed in realistic simulated conditions.
9. (TRL 7) Has a near-final prototype been demonstrated in the actual operating environment? Yes for a field trial, a pilot in a plant, a hospital study or a deployment at a customer site.
10. (TRL 8) Is the actual system complete and has it passed the tests and demonstrations that qualify it for use? Yes if the final version passed acceptance or qualification tests and, where required, certification or regulatory approval.
11. (TRL 9) Has the actual system been proven in routine operational use? Yes if the final product is in real use by customers or operators, under the full range of expected conditions.
12. (TRL 9) Is it in use under normal conditions, not only in a supervised trial or pilot? Yes if it runs without the development team present, as part of normal operations.

## Results by level

- **TRL 1:** A scientific effect is seen and written up. No application yet. NASA: "Basic principles observed and reported." EU: "Basic principles observed" Next: Write down a concrete application and the analysis that suggests it could work.
- **TRL 2:** Someone proposes how the effect could be used. Mostly paper and analysis. NASA: "Technology concept and/or application formulated." EU: "Technology concept formulated" Next: Design and run the smallest experiment that proves the critical function.
- **TRL 3:** The key function works in a lab experiment, usually on separate parts. NASA: "Analytical and experimental proof-of-concept of critical function and/or characteristics." EU: "Experimental proof of concept" Next: Put the key components together on the bench and test them against written predictions.
- **TRL 4:** The parts are put together and work as a rough system on the bench. NASA: "Component and/or breadboard validation in a laboratory environment." EU: "Technology validated in a lab" Next: Define the real conditions the technology must work in, and test the integrated system under simulated versions of them.
- **TRL 5:** A higher-fidelity version is tested in conditions that simulate real use. NASA: "Component and/or brassboard validated in a relevant environment." EU: "Technology validated in a relevant environment (industrially relevant environment in the case of key enabling technologies)" Next: Build a representative prototype with the intended form and demonstrate all key functions in a relevant environment.
- **TRL 6:** A representative prototype performs all its key functions in near-real conditions. NASA: "System/sub-system model or prototype demonstration in a relevant environment." EU: "Technology demonstrated in a relevant environment (industrially relevant environment in the case of key enabling technologies)" Next: Arrange a pilot or field trial in the actual operating environment with a partner.
- **TRL 7:** A near-final prototype works in the actual setting: a plant, a hospital, a field. NASA: "System prototype demonstration in an operational environment." EU: "System prototype demonstration in an operational environment" Next: Complete the final design and pass qualification, acceptance and any certification tests.
- **TRL 8:** The final product passes its tests and, where needed, its certifications. NASA: "Actual system completed and "flight qualified" through test and demonstration." EU: "System complete and qualified" Next: Deploy the final system in routine use and record its performance.
- **TRL 9:** The product runs in real use across the full range of expected conditions. NASA: "Actual system flight proven through successful mission operations." EU: "Actual system proven in an operational environment (competitive manufacturing in the case of key enabling technologies, or in space)" Next: You are at the top of the scale. Track performance in use and plan the next generation.

Definitions quoted word for word from NPR 7123.1D, NASA Systems Engineering Processes and Requirements, Appendix E. Technology Readiness Levels (https://nodis3.gsfc.nasa.gov/displayDir.cfm?Internal_ID=N_PR_7123_001D_&page_name=AppendixE) and Horizon Europe Work Programme 2026-2027, 15. General Annexes, "Technology Readiness Levels" (https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/wp-call/2026-2027/wp-15-general-annexes_horizon-2026-2027_en.pdf).

## Frequently asked questions

### What is a TRL calculator?

A TRL calculator estimates a technology's readiness level, from TRL 1 (basic principles observed) to TRL 9 (actual system proven in operation), by asking what has been demonstrated and where. This free check gives an indicative level from 12 questions written from the public NASA and EU definitions.

### Is this TRL check accurate?

It is indicative. It tells you which level your answers point to, but it does not look at your evidence, your technology domain or the separate critical elements of your system. For a deeper and more complete assessment, use [TRL Pro](https://zernyxhub.com/trl-pro), which assesses readiness with ZTRAF, Zernyx's own copyrighted framework, organised by technology domain.

### How is ZTRAF different from the NASA and NTRAF scales?

NASA's definitions and NTRAF's core definitions are general: the same wording applies to a vaccine, a battery and a software product, and you interpret it for your field. ZTRAF, the Zernyx Technology Readiness Assessment Framework, is organised by technology domain, with its assessment categorised for more than 60 domains and subdomains, so your technology is assessed against criteria for its own field. It is Zernyx's own framework, aligned with global standards and separate from NTRAF. Use this free check for a first estimate and [TRL Pro](https://zernyxhub.com/trl-pro) for a domain-specific assessment.

### Which TRL definitions does this check use?

The questions follow the level definitions published by NASA (NPR 7123.1, Appendix E) and the European Union (Horizon Europe General Annexes). The result quotes both word for word. To compare them with the US DoD, India's NTRAF and BIRAC's sector scales, see the [TRL levels explorer](https://zernyxhub.com/blog/trl-levels-explained#trl-explorer).

### Can I use the result in a grant application?

Use it as a first estimate, not as evidence. Funders expect you to state the framework you used and show the evidence for each level, such as validation reports and test data. Read [how to prove your TRL](https://zernyxhub.com/blog/trl-evidence).

---

Compare all frameworks: https://zernyxhub.com/blog/trl-levels-explained. More: https://zernyxhub.com/llms.txt
