JournalTechnology readiness

TRL for MeitY SAMRIDH and TIDE 2.0: what tech startups need to show

MeitY SAMRIDH and TIDE 2.0 explained by readiness: who each scheme funds, what they state about stage, and the TRL evidence an IT startup should prepare.

By Dr. Deepak Chitkara, Founder, Zernyx Innovations 7 min read

Part of the guide TRL levels explained: what TRL 1 to 9 really mean, and how to place your technology

Short answer

MeitY's SAMRIDH and TIDE 2.0 fund IT startups at different stages, and neither sets a formal TRL. TIDE 2.0 supports ICT startups from ideation to prototype, with proof-of-concept grants of up to ₹7 lakh. SAMRIDH supports IT product startups to scale through accelerators, with investment of up to ₹40 lakh matched by private investment.

Two schemes from the Ministry of Electronics and Information Technology (MeitY) are two of its main schemes for IT startups: TIDE 2.0 and SAMRIDH. They are often mentioned together, but they serve startups at opposite ends of the journey. One funds an idea becoming a prototype; the other helps a product that already works to scale.

Neither scheme states a technology readiness level. Reviewers and accelerators still judge readiness, in their own words. This post sets out what each scheme says about stage and money, maps that to TRL, and lists the evidence a startup should bring.

What do the two schemes offer?

The Startup India playbook of government schemes (June 2026) summarises both:

Point TIDE 2.0 SAMRIDH
Full name Technology Incubation and Development of Entrepreneurs Startup Accelerators of MeitY for Product Innovation, Development and Growth
Ministry MeitY MeitY
Stage in the playbook Ideation to prototype Scaling
Who it supports ICT startups using emerging technologies such as AI, IoT, blockchain and robotics IT-based and software product startups
Money Proof-of-concept grants of up to ₹7 lakh; larger support varies by centre Investment of up to ₹40 lakh, averaging ₹30 lakh, with matching private investment
Route Through TIDE centres at incubators Through selected accelerators; startups find them via the MeitY Startup Hub

The playbook does not list a direct application route for either scheme. You apply to a participating incubator or accelerator, which runs its own call and selection.

An implementing accelerator, FITT at IIT Delhi, adds that SAMRIDH startups should already have "proof of concept for their product", that accelerators take equity through a SAFE or promissory note, and that cohorts hold between 5 and 10 software product startups.

How do the schemes map to TRL?

Where the two MeitY schemes sit on the TRL scale

TRL 9Proven in operation
TRL 8System complete and qualified
TRL 7Prototype, operational environment
TIDE 2.0 range
TRL 6Prototype, relevant environment
TRL 5Validated, relevant environment
TRL 4Validated in a lab
TRL 3Proof of concept
TRL 2Concept formulated
Neither scheme states a TRL; this mapping is an interpretation of their stated stages.

TIDE 2.0's stated stage, ideation to prototype, covers roughly TRL 2 to TRL 5 or 6. A team with a concept and early code is at the start of that range; a team with a working prototype tested on realistic data is near the end.

SAMRIDH's stated stage, scaling, and the accelerator's requirement of a proof of concept for the product, point higher. For a software product, scaling usually means the product runs for real users, which is TRL 7 and above. TRL for software explains how each level reads for an app or platform.

This mapping is my interpretation, not the schemes' wording. Read each accelerator's or incubator's call, because their criteria decide selection.

What evidence should a TIDE 2.0 applicant bring?

TRL band Evidence that persuades
TRL 2 to 3 A clear problem, the technical approach, and a working proof of concept on sample data
TRL 4 Core modules working together in a test setup, with results
TRL 5 to 6 A prototype run on realistic data or in a setting that simulates real use, with performance measured against what you predicted

A proof-of-concept grant of up to ₹7 lakh suits the move from TRL 3 to TRL 5. Spell out which level you are at now, which you will reach with the grant, and how you will show it.

What evidence should a SAMRIDH startup bring?

Area Evidence
Product A live product, with uptime and usage data
Customers Paying or committed customers, with names where permitted
Market Size of the market you can reach, and your share plan
Team Founders and key hires who can scale the product
Use of funds How the investment moves the product to more customers or markets

At this stage the technology question is mostly answered. Accelerators look at traction and the plan to scale, so readiness evidence supports the case rather than making it.

TIDE 2.0 or SAMRIDH

TIDE 2.0
Idea to prototype
Grants up to ₹7 lakh for proof of concept
Prove the technology works
vs
SAMRIDH
Scaling a working product
Up to ₹40 lakh, matched by private investment
Prove customers want it

Pick by stage: technology risk for TIDE 2.0, market risk for SAMRIDH.

How should you write the TRL statement?

A good readiness statement in an application has four parts, each one or two sentences:

  1. Current level, with the framework named: "Our platform is at TRL 4 on India's NTRAF scale."
  2. Evidence: what was tested, on what data or in what setting, with the result.
  3. Target level at the end of the grant or programme, and the test that will show it.
  4. Risks: what could stop you reaching the target, and your plan if it does.

For example: "Our crop-disease model is at TRL 3: it identifies six diseases with 91% accuracy on a public image set. With this grant we will reach TRL 5 by testing the app on 2,000 field images from two districts, against an accuracy target of 85%. The main risk is image quality from low-end phones, which we will address with on-device checks." The figures in that example are invented; use your own.

Reviewers trust a modest, well-evidenced claim more than an ambitious one. If you are unsure between two levels, state the lower one and explain what is needed for the higher.

How does ZTRAF check your stage?

Neither scheme names a TRL framework, so reviewers may use NASA-style definitions or India's NTRAF. ZTRAF, the Zernyx Technology Readiness Assessment Framework, is Zernyx's own copyrighted framework, aligned with global standards and used in TRL Pro. It is separate from NTRAF and covers more than 60 technology domains and subdomains, including software and AI products.

An AI model, an IoT device and a SaaS platform reach "prototype" in different ways, so check your claim for your own kind of technology before a reviewer does. You answer structured questions with your evidence and get back an assessed TRL from 1 to 9, the gaps to close and the next steps. Then write your TRL statement in NASA or NTRAF wording if the call asks for it.

A worked example

Illustration with invented figures. A Bengaluru team builds an AI crop-disease detection app.

Year Stage Readiness Scheme fit Funding in this illustration
Year 1 Model tested on public image sets TRL 3 TIDE 2.0 proof-of-concept grant ₹7 lakh
Year 2 App tested with 200 farmers in one district TRL 6 to 7 Own funds and angels ₹25 lakh
Year 3 15,000 paying users in three states TRL 8 to 9 SAMRIDH accelerator cohort ₹30 lakh, plus ₹30 lakh matched

The sequence matters. Applying to a scaling programme in year one wastes the founders' time; applying for a proof-of-concept grant in year three understates the company.

Common mistakes

  • Applying for SAMRIDH with a prototype and no customers.
  • Treating a TIDE 2.0 grant as funding for a finished product.
  • Claiming a TRL without evidence; see overstating TRL in a grant.
  • Applying to the wrong incubator or accelerator for the field.
  • Ignoring that SAMRIDH involves equity through the accelerator.

My view: matching the scheme to your stage matters more than polishing the technology section, and a clear TRL statement does most of that work. The hedge is that both schemes run through many centres with their own calls and amounts, so check the current call before relying on any figure here. State schemes have their own rules too; see TRL for state startup grants.

To check your level before you apply, TRL Pro assesses your technology's readiness and returns a level from TRL 1 to 9, using Zernyx's own copyrighted framework (ZTRAF) covering more than 60 technology domains and subdomains.

Common questions

What TRL does MeitY SAMRIDH require?

The scheme does not state a TRL. The Startup India schemes playbook (June 2026) lists its stage as scaling, and an implementing accelerator says startups should already have proof of concept for their product. In TRL terms, that usually means a working product in use, around TRL 7 or above for software.

What TRL does TIDE 2.0 require?

TIDE 2.0 does not state a TRL either. The playbook lists its stage as ideation to prototype, with proof-of-concept grants of up to ₹7 lakh. That covers roughly TRL 2 to TRL 5 or 6 for a software or hardware product.

How much funding does SAMRIDH give a startup?

According to the Startup India playbook, an investment of up to ₹40 lakh to the startup, averaging ₹30 lakh per startup per cohort, with matching private investment of up to ₹40 lakh. It is delivered through selected accelerators, not applied for directly.

How do I apply for SAMRIDH or TIDE 2.0?

Through the participating accelerators and incubators. The playbook directs startups to the MeitY Startup Hub to find SAMRIDH accelerators. TIDE 2.0 runs through TIDE centres at incubators, which publish their own calls.

Dr. Deepak Chitkara
About the author

Dr. Deepak Chitkara

Founder, Zernyx Innovations

Connect on LinkedInWatch on YouTube
More about Dr. Deepak Chitkara
  • Professor, Department of Pharmacy, BITS Pilani.
  • Has coordinated the Intellectual Property Enablement and Commercialization (IPEC) division at BITS Pilani.
  • Has served as Coordinator of the BITS-Technology Enabling Center, supported by the Department of Science and Technology (DST), Government of India.

Know your TRL before a reviewer asks.

Run a guided, evidence-backed TRL 1 to 9 assessment with TRL Pro, ready for funding, licensing and commercialization decisions.

Assess with TRL Pro

Keep reading

Looking for something else?